Regulation (EU) 2025/40 · in application Repealed Directive 94/62/EC — 12 Aug 2026 Last reviewed 2026-08-16
Requirements Timeline Evidence Packaging Check packaging Updates Testing Source compliant packaging
EU Packaging & Packaging Waste Regulation Regulation (EU) 2025/40 · Regulatory intelligence for packaging

Understand.

Check.

Comply.

Reg. (EU) 2025/40 · 8 requirement families · 2026 → 2040

PPWR.how tracks every requirement, deadline and implementing act of the EU packaging regulation — and maps them onto the packaging you actually ship.

A folded kraft carton
The object every article on this site eventually lands on
Status — days in application since 12 Aug 2026
Next binding date —days 12 Aug 2028 — harmonised labelling (Art. 12)
Tracked 8requirement families Art. 5–29 · Annexes I–XII · implementing acts
Every figure carries 1source EUR-Lex citation, effective date, review stamp
Start here

What PPWR is, and whether it applies to you.

If you have landed here because someone forwarded you a deadline, this is the 200-word version.

It replaced a directive with a regulation

Until August 2026, EU packaging law was Directive 94/62/EC. A directive is transposed by each Member State separately, which is why a pack could be legal in France and non-compliant in Germany. PPWR is a regulation — one text, directly applicable in all 27 markets, with no national version to check first.

It binds more than packaging manufacturers

Brand owners, importers, distributors, fulfilment service providers and online marketplaces each carry their own duties. If you place a packaged product on the EU market you are in scope, even if you never designed the packaging and never touched it.

It is a market-access rule, not a fine

The requirements are conditions for placing packaging on the market. Packaging that misses them cannot legally be sold in the EU. That is a different kind of risk from a penalty — it stops the shipment, not the accounts.

The short version

Three of the eight requirement families are already in force. The expensive ones land on 1 January 2030 — which, counted backwards through qualification and artwork cycles, is a decision you are taking this year.

Requirements · Art. 5–29

Eight requirement families decide almost everything.

Six of the eight land on the packaging itself — you can point at them. The other two, reuse systems and the technical file, are obligations on how you operate.

Fig. 01 — six of the eight land on the pack itself PAP 21 and the QR carrier are real marks; grades and sorting icons do not exist yet
Compliance calendar

PPWR arrives in stages. The expensive ones are already visible.

Packaging decisions taken this year are already constrained by 2030.

2025
11 Feb 2025 Regulation enters into force 18-month transition begins.
You are here2026
12 Aug 2026 PPWR applies Minimisation, substances of concern, documentation and PFAS duties bite.
2028
12 Aug 2028 Harmonised labelling A full artwork re-issue across every SKU.
2030
1 Jan 2030 The big one Recyclability grade C · recycled content · empty space ≤50% · reuse targets.
2035
1 Jan 2035 Recycled at scale Design for recycling stops being sufficient.
2038
1 Jan 2038 Grade B becomes the floor 80% recyclable by weight, minimum.
2040
1 Jan 2040 Targets step up Up to 65% PCR; 70% transport packaging reuse.
Regulatory evidence

Nothing here is asserted. Everything is cited.

Compliance decisions get audited. Every requirement, figure and date carries the same evidence block — so you can hand it to a lawyer, a customer or an authority as it stands.

EUR-Lex32025R0040Consolidated

“All packaging shall be recyclable. Packaging shall be considered recyclable where it complies with the design for recycling criteria … and, from 1 January 2035, where it is recycled at scale.”

Regulation (EU) 2025/40 — Article 6(1), (4)

Legal basis
Art. 6 + Annex II
Effective date
2030-01-01
In force since
2025-02-11
Last reviewed
2026-08-16

Five parts, each one there because someone eventually asks for it

  • The article, quoted — not paraphrased.
  • Legal basis — the article and annex that create the obligation.
  • Effective date, separate from entry into force — the most common error in PPWR coverage, and one we never make.
  • Last reviewed — the date a human checked it against the consolidated text.
  • Change history — so you can see what moved since you last quoted it.
Find it by your packaging

Start from what you actually ship.

Almost nobody arrives asking about Article 6. They arrive asking whether their mailer is still legal in 2030. Enter from material, format or industry.

Tools

Reading is not compliance. Check the pack.

Four fields is usually enough to narrow eight requirement families down to the three that actually decide your next purchase order.

PPWR Packaging Checker

Describe the pack.

Run the checker
Result — sample output 3 of 8 families apply
Art. 7 Recycled content35% PCR for other plastic packaging 2030
Art. 6 RecyclabilityLDPE mono-material — provisional grade B Grade B
Art. 12 LabellingMaterial composition label + digital carrier 2028
Regulatory intelligence

The regulation is written. The detail is still being decided.

Three of the acts that decide what compliance actually means have not been adopted yet. That is the most important thing on this page.

All tracked developments Status as at 2026-08-16 — verify against EUR-Lex
Laboratory technician preparing a flexible packaging sample in a vial for analytical screening
Laboratory photography — sample preparation for total fluorine screening.
Testing & verification

Most requirements end in a lab report.

Knowing the rule is not evidence. These are the methods authorities and customers ask for, and the standards behind them.

PFAS in food-contact packaging Total fluorine screening, then targeted LC-MS/MS. Art. 5(5)
Recycled content verification Chain-of-custody audit plus analytical confirmation. EN 15343
Recyclability assessment Design-for-recycling scoring and sortability trials. Art. 6 · Annex II
Packaging solutions

When the answer is a different pack.

Formats we manufacture and source, listed against the requirements they address. Not a catalogue — each one is quoted against your specification, artwork and volumes.

Next step

Not sure where your packaging stands?

Send one specification. You get back the requirements that apply, the dates they apply from, the evidence you will need — and, if the pack cannot get there, the formats that can.